Nationwide Building Society

Flag United Kingdom, Wellingborough Expansion Scheme

An additional 4 x 400kVA Scania diesel generator sets for MINT application.

The site at Wellingborough will have a power upgrade scheme to incorporate into the current site electrical infrastructure an additional 4 x 400kVA of stand-by power.

This will be achieved in two stages of two generators, the complete design and build package will include the supply of ComAp’s standard InteliSys for each generator with electronic interfacing and remote InteliSys screens within the switch room.

The scope of supply will also include the standard InteliMains solution for parallel to mains operation with InteliProtec G59 protection relay.